Introduction
Although the first commercially successful steamship was completed in 1807, it was a very long time before commercial sailing ships were
completely replaced. Steamships required networks of coaling stations and other support services to operate. Early steamships were very
inefficient, but there were incremental improvements in the design of engines, boilers and other mechanical components throughout the 19th
century.
From the time of the opening of the Suez Canal in 1869, the amount of cargo carried by sailing vessels gradually decreased - particularly larger
cargoes. The last British four-master Garthpool was in service until 1929 when she was wrecked. A great deal of coastal
traffic in Britain continued to be carried on vessels like Thames Sailing Barges, with Cambria trading under sail until
1970. My late friend Stan Mayes worked on Thames Barges until 1939/40, and you can read about this on my website
HERE[13].
In the 1860s, a reduction in the duty payable on tea led to an increase in consumer demand. This led to a boom in the construction of 'tea
clippers' - fast vessels that could bring the new tea harvest from China to get the best prices. Cutty Sark,
arguably the best of them, was completed by Scott & Linton in 1869 for John Wallis in 1869.
This was bad timing as in the same year the opening of the Suez Canal shortened the route from Britain to China by about 3,300 miles and
reduced the costs associated with having to round the Cape of Good Hope. As a result, Cutty Sark only made eight 'tea runs'
between 1870 and 1877. After that the ship was used for other kinds of trade - mainly wool.
I am not going to rehearse the detailed history of the ship as this is covered in many books and articles and there is a decent history
on Wikipedia [12].
The rest of this article tells the story of Cutty Sark from her sale by John Wallis, to her restoration and final
establishment on permanent display at Greenwich. It ends with the opening of the ship to the public in 1957 and does not include later
refits and fires.
Sale to Ferreira & Co.
Cutty Sark was sold to Portuguese owners, Ferreira & Co. in 1895 and renamed Ferreira. She
was used in general cargo trade from her home port of Lisbon and had a hard-working and demanding life in the following years.
Ferreira took shelter in Falmouth in need of repair in January 1922. She was recognised by Captain Wilfred Dowman
(1879-1936), who had been impressed by the vessel as an apprentice seaman in 1894. He had an interest in a local boatyard and was
running a sea training school. He decided to purchase her to use as a training ship despite the vessel being in a poor state of repair
[10].
Captain Dowman had retired from life at sea and he and his wife Catharine had come to live in Cornwall at Trevissome House in
Flushing in the early years of the 1920s. He had an interest in the Ponsharden Shipyard in Falmouth and he and Catharine had also
set up a sea training scheme for poor boys of good character in a 163-ton schooner named Lady of Avenel. The schooner had been
built in 1874 in Falmouth by H. S. Trethowan for the owner Edward Dixon Anderton of Falmouth and employed as a freighter especially
in the granite trade from Cornwall. Sold out of Cornwall in 1900 she returned in 1921 owned by the Dowmans, who installed an auxiliary
engine and refitted her as a training ship. The concept of training ships was close to the Dowmans' hearts as they had met on a
voyage from London to Sydney in 1912 on board the Port Jackson, a cadet training ship on which Wilfred was First Mate and Catharine
was one of the three additional passengers.
The purchase was eventually completed in October 1922 for £3,750 and the ship brought back to Falmouth by Captain Edward Rooney, a
Falmouth pilot, and towed into the harbour by the Falmouth tug Triton.
Captain Dowman was determined to restore the re-named Cutty Sark to her original appearance, and the work was undertaken by the
Ponsharden shipyard. The ship was re-rigged to the original plans by the workers of R. S. Burt of the Little Falmouth Yacht Yard.
Cutty Sark was then opened as a training ship by the Dowmans and moored off Trefusis Fields, Flushing. Numerous boys were trained
over the years for careers in the Royal Navy or the Merchant Marine. Cadets were instructed in nautical skills and given practical,
hands-on training in seamanship. Cutty Sark became a well known and loved sight in Falmouth and a subject for artists such as
Henry Scott Tuke (1858-1929) and photographers. The ship was also open to the public as a visitor attraction.
Cutty Sark in Falmouth Harbour September 1936
[10]
Figurehead of Cutty Sark in Falmouth Harbour September 1936
[10]
Cadets on the deck of the restored ship in Falmouth Harbour September 1936
[10]
This is Henry Scott Tuke's most famous painting 'August Blue' that hangs in Tate Britain as part of the Historic and Modern British
Art collection. Tuke was a keen sailor and owned an old French brigantine named Julie of Nantes that he used as a
floating studio. Although this painting probably doesn't show Cutty Sark, it was painted at Falmouth in 1894 and
shows several similar ships in the background. Apart from ships, Tuke specialised in painting male nudes. He was a friend of
John Addington Symonds and Oscan Wilde. His work fell out of favour, but became popular with the LGTBQ+ community in the 1970s.
After Captain Dowman died in 1936 his wife Catherine gave the vessel to the Thames Nautical Training College along with £5,000 towards
the cost of future maintenance. Twelve cadets took her to Greenhithe under tow in 1938.
Training Ship at Greenhithe
Cutty Sark joined HMS Worcester at Greenhithe where she was used for sail training for cadets
at the Thames Nautical Training College.
Cutty Sark And HMS Worcester as training ships in 1938
[2]
Cutty Sark fell into disrepair during the war years and was replaced by another training ship. She was moved to Deptford in 1951
during the Festival of Britain festival. She was then moved to a dry dock at Millwall for an inspection of her hull to determine
her fate.
This is a short BBC news clip about this move [15].
The Cutty Sark Preservation Society emerged from an informal committee that had been set up by the Duke of Edinburgh. It launched a public appeal
which raised £250,000.
Back at Greenhithe, on 30 January 1952 her bow and figurehead were damaged when the moored vessel was struck by tanker Aqueity.
She broke adrift and was towed to temporary moorings at Rainham.
De-Rigging at the East India Import Dock
On a misty and drizzling 18 February morning, Cutty Sark was towed about 15 miles from Greenhithe to a berth at the East India Import Dock,
about two miles downstream from her final resting place at Greenwich, by the tugs Gondia and Java for the initial
retrofit work. Ships along the Thames sounded their sirens as she passed.
Cutting from 'The Sphere' 27 February 1954
[4]
Tug Gondia
[7]
Tug Java
[7]
Construction of the Dry Dock
The location chosen for the dry dock for Cutty Sark was next to the Thames in Greenwich, between Greenwich Pier and the entrance to
the Greenwich Footway Tunnel. The 1948 photo below shows this area with a block of houses behind the pier where the dry dock would be built. These
would be demolished and the pier and surrounding area remodelled.
In June 1954 'The Sphere' published a photo showing progress with the construction of the dry dock. You can see the shape of the final stepping on
the far right. This view looks towards the Thames and the wall of steel piles was converted into a gate by welding after the ship was admitted.
A Commemoration stone was laid by the Duke of Edinburgh on 2 June. The process would be made easier by decreasing the weight of the ship by removing
upper masts, deck houses and ballast.
In September 'The Illustrated London News' had a photo showing the virtually complete dry dock.
Cutting from 'The illustrated London News' 25 September 1954
[8]
Refitting Work in the East India Dock
In October 'The Sphere' had photos with an update on progress with work at the East India Dock. There seems to have been very little
regard to safety in those days.
Cutting from 'The Sphere' 2 October 1954 showing fitters working on the decks and masts
[4]
Cutting from 'The Sphere' 2 October 1954 showing fitters repairing the figurehead
[4]
Cutting from 'The Sphere' 2 October 1954 showing decayed decking on the port side
[4]
Cutting from 'The Sphere' 2 October 1954 showing work in progress on the stern
[4]
Cutting from 'The Sphere' 2 October 1954 showing a view of the deck from one of the masts
[4]
Arrival at Greenwich
'The Daily News' included an item about one of the men aboard Cutty Sark on this last voyage. He had joined her crew
as an apprentice in 1885 at the age of 13.
This is a short Movietone News clip of the trip from East India Dock to Greenwich [14].
This grainy video shows the arrival at Greenwich. I can make out the names of tugs Kenia, Condia and there is a third
whose name I can't see. A crowd of men in uniform raise their hats at around 1:10. A surprising number of people are standing close
to the dry dock. [7]
Cutty Sark was floated into the drydock on a high tide on 10 December 1954. Note the entrance to the Greenwich Footway Tunnel to
the back of the photo and the rough banks of the side of the dry dock. I suspect that the 13 families, whose homes are shown in the 1948
photo further up the page had been demolished were not particularly enthusiastic.
The work done at East India Dock was just the start of the restoration process and work on making the ship
ready for opening to the public began straight away.
'The Illustrated London News' published these photos of work underway in March 1955.
Bow view with work underway. Work has started on sealing the dry dock from the Thames
[8]
Fitters working on the mizzen mast high above deck. The Wheatsheaf pub is to the right just off the photo.
The name of the pub was changed to Gipsy Moth in 1972 to commemorate Francis Chichister's single-handed circumnavigation
[8]
Oblique view past the port bow with the entrance to Greenwich Pier in the background
[8]
'The Sphere' published these photos of work underway in May 1955.
Shipwrights examining the copper sheathing
[4]
Welding stays for the new nameplate
[4]
Replacing decking before refitting deck houses
[4]
1956
Work continued during the rest of 1955 and 1956 and 'The Illustrated London News' published an update on progress in December 1956.
Bow view. Some of the standing rigging has been installed
[8]
The lower hold with new deck being fitted
[8]
View of the bow from the foremast. Concrete steps can be seen each side of the dry dock
[8]
Work proceeding on many parts of the ship in this bow view. Painting has started
[8]
1957
'The Sphere' reported in February 1957 that restoration work was nearing completion. Although not shown in these photographs the
article notes that seaman's bunks have been installed in their original positions.
Bow view. Most of the standing rigging is in place and the bowsprit has been refitted. Preparation of the surrounding area is under way
[4]
Old ship figureheads being mounted on display in the lower deck
[4]
Restored fireplace - part of the original structure
[4]
In March 'The Sphere' had a photo of Arthur Levison creating a new figurehead with the old one alongside. The wood for the figurehead had been
donated by the Government of Canada. The figurehead was expected to take three months to complete.
In May 'The Sphere' had photos showing the progress on the ship, the surrounding area and the figurehead.
Work nearing completion with most of the running rigging in place and the surroundings greatly cleaned up
[4]
Arthur Levison fitting the figurehead
[4]
Official Opening
'The Sphere' published a further set of photos a few days before the official opening and Cutty Sark looks splendid. This would
make an interesting puzzle for car enthusiasts to identify the cars shown. The first photo shows The Wheatsheaf pub mentioned earlier.
Panoramic view of the refitted ship
[4]
Stern view
[4]
Bow view
[4]
Cutty Sark was formally dedicated and opened on 25 June 1957 by Queen Elizabeth II and the Duke of Edinburgh.
Queen Elizabeth II at the dedication of Cutty Sark in 1957
[7]
This is a short Movietone News clip of the official opening by Queen Elizabeth II [14].
Sea Breezes 1956
This page was inspired by an article I came across browsing old copies of 'Sea Breezes' that someone gave me
some years ago. It is interesting as it gives a picture of the meticulous effort that went into the planning of the refit and
restoration prior to the public opening. It was written for the June 1956 edition by the editor of the magazine, and I believe this was
George Dickinson.